Home inspections in Riverside South
Riverside South is mostly homes built since the late 1990s, with new phases still under construction. Many owners here are inside their Tarion warranty period.
- Report within 24 hours
- Photos with every finding
- Your Tarion deadlines
What I look out for in Riverside South
Every inspection covers the whole home. These are the things that come up most here.
Tarion deadlines
The year-end and second-year forms are easy to miss. An inspection keeps you on time.
Builder-grade details
Caulking, flashing and attic venting are checked where shortcuts are common.
Lot drainage
Grading and downspouts on newer lots are checked so water flows away.
Your Tarion warranty timeline
Your new home’s warranty only covers what you report on time. Enter your possession date to see your deadlines and when to book each inspection.
Best time to book an inspection
Pre-delivery inspection (PDI)
Your builder walks you through the home before you move in and records anything damaged, incomplete or not working on the PDI form. Bring an inspector so the items that matter get written down.
Book this inspection- Possession
- Your closing day
- Book your inspection
- Once the PDI date is set
Initial Form
List warranty items starting the day after possession. The form is submitted automatically on day 41, and your builder then has 120 days to make repairs. Many people still call this the 30-day inspection.
Book this inspection- Opens
- Day 1
- Submitted automatically
- Day 41
- Book your inspection by
- Day 30
Mid-Year Form
For anything new that shows up in your first months, such as cracks, drafts or doors that start to stick. Add items any time; the form is submitted automatically at the end of the window.
- Opens
- Day 42
- Submitted automatically
- Day 183
Year-End Form
Tarion accepts only one Year-End Form, so an inspection around month 11 makes it count. After day 365, a 10-day grace period needs a manual submission and proof you told your builder.
Book this inspection- Opens
- Day 183
- Submitted automatically
- Day 365
- Book your inspection by
- Day 350
- Grace period ends
- Day 375
Second-Year Form
For items under the two-year warranty: water getting in through the foundation or building envelope, exterior cladding, and the electrical, plumbing and heating systems. You can submit more than one.
Book this inspection- Opens
- First anniversary
- Closes
- Second anniversary
- Book your inspection by
- 3 weeks before it closes
Major Structural Defect Form
For defects that cause a load-bearing part of the home to fail, or that seriously affect your use of it as a home. You can submit several forms, and each one becomes its own case with its own timeline.
Book this inspection- Opens
- Second anniversary
- Closes
- Seventh anniversary
- Book your inspection by
- 60 days before it closes
Based on Tarion’s published timelines as of November 2026. These dates are a guide: confirm yours in your Tarion MyHome account or on Tarion’s claim forms and timelines page.